OUR DYNAMOMETER HAS FINALLY ARRIVED!

Thursday 22nd January 2004…Pick up!

After collecting a typically slow Penske rental truck, I set off for Atlanta to take delivery of our long awaited AWD Dyno Dynamics lowboy dyno. The purchase process has taken approximately three months and we are eager to have it situated at our new shop in Calhoun GA.

The Dyno was heavier than I had anticipated weighing in, with crates, at around 7000lb.  Standing on the delivery dock at the shipping terminal, watching a heavy duty fork lift attempting to situate the largest crate, made me wonder if I had rented a large enough truck?

 

After a brief conversation with the loading crew about air brakes and payload we managed to close the rear door of the truck with the four crates safely inside. The paperwork was signed and within 10 minutes I was negotiating Atlanta traffic once more.

 

I arrived back at the shop and the crates were unloaded and placed in the general area where the dyno will eventually be bolted down.

 

Friday 23rd January 2004 onwards …Unpack

 

A solid few days work followed - as told by this picture gallery ...

Click each picture for an enlarged view

dyno_unpacking_001.jpg

 

 

 

 

Hauling last items from the truck

dyno_unpacking_002.jpg

 

 

 

 

Space to maneuver the crates

dyno_unpacking_010.jpg

 

 

 

 

They've survived the sea trip

dyno_unpacking_011.jpg

 

 

 

 

The front roller uncrated

dyno_unpacking_014.jpg

 

 

 

 

Crates in rough location

dyno_unpacking_015.jpg

 

 

 

 

...and the computer cabinet

dyno_unpacking_019.jpg

 

 

 

 

Waiting for the Heister

dyno_unpacking_022.jpg

 

 

 

 

Ramps

positioning_of_dyno_001.jpg

 

 

 

 

The tracks go down

positioning_of_dyno_003.jpg

 

 

 

 

Both beds on the tracks

build_up_of_dyno_001.jpg

 

 

 

 

Starting laying the cabling

build_up_of_dyno_007.jpg

 

 

 

 

Starting the sliding middle bed

build_up_of_dyno_002.jpg

 

 

 

 

Coupling more cables

build_up_of_dyno_003.jpg

 

 

 

 

Front roller mechanism uncovered

build_up_of_dyno_005.jpg

 

 

 

 

Cables coupled at computer ...

For setup completed click here